Explainers
Gate vs post-run monitoring: why logs are not enough
1 July 2026 · 4 min read
Watching after the inference does not prevent the action. How score/alert differs from control at ingest.
The “we’ll catch it in the logs” trap
An agent that writes to the CRM, exports a pack, or calls a tool has already acted. A late alert documents the incident; it does not stop it.
Supervision platforms (scores, judges, drift) help CIOs — they do not replace a legal brake before apply.
What Compliade’s Gate does
On every instrumented action: allow, warn, deny, or require_approval.
require_approval = Art. 14 productized: a human decides in Validations before the action applies.
Both can coexist
Compliade also exposes ops telemetry (tokens, latency) for the cockpit — under the Gate, not instead of it.
Category stays: control + proof OS, not a judge hypervisor.